Restaurant Building Permits in Toronto, 2017 to 2025
Our analysis of City of Toronto permit data counts 3,237 restaurant building permits issued from 2017 to 2025. See the yearly trend and what it means for you.
Our analysis of City of Toronto building permit data shows that 3,237 restaurant building permits were issued between 2017 and 2025, an average of about 360 a year. Counts fell about 40 per cent in 2020, then recovered to roughly 380 a year from 2022 on, still a little below the pre-2020 level.
If you are planning a restaurant build-out, these numbers show how common the work is and what kind of work it usually is. Nearly nine in ten of these permits were for interior alterations, which is the kind of project our restaurant construction team is usually asked to plan and build. If you are comparing Toronto with Peel, our analysis of Mississauga commercial permits shows how long review took there.
How many restaurant permits did Toronto issue each year?
Toronto issued between 258 and 427 restaurant building permits a year from 2017 to 2025. The low point was 2020, with 258, and the high point was 2019, with 427.
| Year issued | Permits | Change from the year before |
|---|---|---|
| 2017 | 377 | First year in the data |
| 2018 | 389 | up 3.2 per cent |
| 2019 | 427 | up 9.8 per cent |
| 2020 | 258 | down 39.6 per cent |
| 2021 | 266 | up 3.1 per cent |
| 2022 | 376 | up 41.4 per cent |
| 2023 | 371 | down 1.3 per cent |
| 2024 | 394 | up 6.2 per cent |
| 2025 | 379 | down 3.8 per cent |
| Total | 3,237 | Peak year 2019, with 427 |
The drop in 2020 and 2021 is large: 2020 was about 40 per cent below 2019, and 2021 was only slightly higher. By 2022 the count was back near 376. The average for 2017 to 2019 was about 398 a year, against about 380 a year for 2022 to 2025. Activity has returned, but not quite to where it was.
The practical point for a tenant is that the permit office and the design and trades community are handling a steady, high volume of restaurant work again. Plan your schedule on that basis, and do not assume that an off year means a faster review.
What kind of work do restaurant permits cover?
Almost all of it is interior work. Of the 3,237 permits, 2,828 (87 per cent) were recorded as interior alterations. Only 24 were for new buildings and 45 were recorded as a change of use. About 368 (11 per cent) mention take-out in the proposed use.
That matches how most restaurants open. A new operator usually takes over a space that was a shop, an office or another restaurant, then rebuilds the inside. The big decisions are inside the walls: the kitchen layout, exhaust, plumbing and seating. If the space was not previously a restaurant, the project may also need a change of use, which we explain on our change of use construction page.
What this means for a first restaurant
- Expect your project to be an interior fit-out inside a unit you lease, so the landlord's rules matter as much as the City's.
- If the previous tenant was already a restaurant, ask whether the existing exhaust, grease and plumbing can be reused before you design around new ones.
- If the unit was never a restaurant, ask early whether a change of use applies. It is the smaller group in the data, but it changes the scope.
- For a quick-service concept, look at how a fast casual restaurant build differs from a full-service one.
Which parts of the city see the most restaurant permits?
Restaurant permits are spread across the city, but they cluster. Using the first three characters of the postal code, the permits fall into 97 postal areas. The five busiest were M5V with 190, M5T with 114, M6J with 99, M1V with 95 and M2N with 92. Together they account for 590 permits, about 21 per cent of the 2,811 permits that have a postal code on record.
Another 426 permits (13 per cent) have no postal code in the data, so these shares understate the true concentration in any area. We use postal areas rather than wards because the City's permit data lists a grid reference rather than a ward number.
For an operator the takeaway is modest. Heavy permit activity in an area tells you that landlords, designers and inspectors there handle restaurant work all the time. It does not tell you the area will suit your concept, so check traffic, the lease and zoning before you commit.
When in the year are restaurant permits issued?
Permit issue dates are fairly even through the year, with a summer peak and a December low. July had the most permits issued over the nine years, with 311, followed by August with 307 and May with 298. December had the fewest, with 200, and February was next lowest with 225.
This is when permits were issued, not when restaurants opened. A permit issued in July often reflects drawings submitted months earlier. If you want to open in a given season, work backward from your target date and allow time for design, review, construction and inspections. Our restaurant renovation page explains how we sequence that work.
What should you have ready before you apply?
A restaurant permit application goes more smoothly when the basic facts are settled first. Have these ready before you call a designer or contractor:
- The lease or an offer to lease, with the landlord's work letter and any rules for tenant work.
- Base building drawings, if the landlord can provide them.
- The concept: full service, quick service, take-out or a mix, with a rough seating count.
- The equipment list for the kitchen, including anything that produces grease or heat.
- The previous use of the unit, if you know it.
- Your target opening date and any fixed dates, such as a lease start or a rent-free period ending.
Restaurant projects usually touch several trades at once, so it helps to see them in one plan. The same planning approach applies to other tenant improvement projects, and it is similar in spirit to the checklist in our guide to renovating a medical clinic in Ontario: decide what happens in each room first, then design the services around it.
How we counted
We used two City of Toronto Open Data tables, Building Permits: Active Permits and Building Permits: Cleared Permits, and combined them. We downloaded both on November 1, 2026.
- What counts as a restaurant permit: the proposed use contains the word restaurant, which includes take-out restaurants.
- Permit types: only Building Additions/Alterations and New Building permits with a building permit number, so separate plumbing, mechanical, sign and fire permits are not counted.
- One count per permit: we used only the original issue of each permit, not its later revisions, and counted each permit number once.
- Excluded: permits with no issue date and permits with a cancelled status.
- Period: permits issued from January 1, 2017 to December 31, 2025. We left 2026 out because the year is not complete.
- Checks: we counted every number twice with two separate methods and used it only where both agreed exactly.
- Limits: the data records the use as the applicant described it, so spelling and wording vary. A permit shows that work was approved, not that a restaurant opened. Some records have no postal code. We did not use any cost figures.
Contains information licensed under the Open Government Licence (Toronto).
Planning a restaurant build-out?
Tell us about your space and your timeline and we will help you work out the scope. Start with our restaurant construction page. For how Toronto permits, change of use and review times work on any commercial job, see commercial general contractor in Toronto.
Frequently asked questions
How many restaurant building permits does Toronto issue in a year?
In our analysis of City of Toronto building permit data, the yearly count ranged from 258 in 2020 to 427 in 2019, with 379 in 2025. These are building permits for additions or alterations and new buildings where the proposed use includes the word restaurant. They do not include separate plumbing, mechanical or sign permits.
Do most restaurant permits in Toronto involve new buildings?
No. Of the 3,237 permits we counted, 24 were for new buildings, and 2,828 listed interior alterations as the type of work. Almost every restaurant project in the city is a fit-out or change inside an existing building.
Which months have the most restaurant permits issued?
Across 2017 to 2025, July had the most permits issued, with 311, and December had the fewest, with 200. The month is the date the permit was issued, not the date the restaurant opened, so it shows when approvals landed rather than when owners started planning.
Does this data show how long a restaurant permit takes?
No. We counted permits by their issue date and did not measure review times. Permit timing depends on the completeness of the drawings, the review queue and any notices sent back to the applicant, so ask your designer and the building department for a current estimate.
Can I use this to choose a location?
It can tell you where restaurant permits have clustered, but not whether a location is a good one. The data records applications for building work, and it says nothing about sales, foot traffic or lease terms. Use it as one input beside your own site research.